Delay in Applying for Building Site Approval; a Loss of View; Commission Advance Loans #378
![BC Real Estate Association logo with the words "legally speaking" printed below](https://www.bcrea.bc.ca/wp-content/uploads/LegallySpeaking.png)
By Gerry NeelyB.A. LL.B. The phrase “the race goes to the swiftest” describes the result of a dispute between the purchasers of two adjoining lots in a subdivision fronting on Columbia Lake. The lots were subject to a building scheme that required the developer’s approval of the building site location and limited construction to a …